Workshop: Day 6
Day 1, Day
2, Day 3, Day
4, Day
5, Day 6, Day
7, Day 8, Day
9, Day 10, Day
11, Day 12, Day
13,
Day 14, Day
15, Day 16, Day
17, Day 18, Day
19, Day 20, Main
(There is low attendance today due to the holiday, Martin Luther
King Jr. Day.) We are now rehearsing in a new space
(just after getting Dance Theatre operational). N&P finish setting
up the technology in the rehearsal studio. There is no Internet
connection, so there will be no downloading files, checking email
or blog, or use of Access Grid. Earth rehearsals will now be in
the 1800 classrooms). P sets up the room so that the back wall is
the back scrim and the front wall left/right are not screens, but
represent left/right screens. The angles are off quite a bit but
I guess it works ok. (This week we got the most new work with
fire and water done, as N created a rough of the water scene and
waterbody fill video.)
|
|
B set up a patch to fill (composite) the dancer's shape with video
using his small camera. |
|
Access Grid: N participates in AG meeting Tuesday from P's office.
DPG others fail to write blurbs on what they will contribute to
Interplay despite emails and verbal acknowledgement to N. N gathers
data on the specs for the Dell PIG, N's Office PIG, N's Laptop and
camera etc for Interplay's call for participants.
Equipment: N puts together tech list and sent it in with P's specs.
(Dell CPU 2.4 Ghz, 512 MB ram, Intell Pentium Processor, Win XP,
Sound Max Integrated Digital Audi, with/ 1 monitor, VGA splitter
one monitor out –this later becomes a problem for the performance
presentation of video; N’s laptop HP Celeron R, CPU 2.4 Ghz,
2.39 GHz, 448MB ram).
|
|
Air: Test of Air bubbles with B/M/P/N. We are testing the floating
dots for their reaction of the bubbles to sound (how quickly the move)
as well as the size P mentions to N M’s projection surface costume
influenced by Alwin Nicholas 1960-70’s who used dancers' bodies
as projection surfaces. |
Air Test
Air Test 2 |
Media: A is working on new Fireburger video clip. K won't come until
1:30, we try to have the media ready for her. Violence snippets are
tied to tap-tiles Jitter patch (B). |
|
1:30 K/E (waiting for B) H20 First rehearsal .
Dancer excited after she sees media (video). |
|
Mk’s footage needs to get to A or P for editing
into Fire. (Mk out of communication until Tues/Wed, N and others are
delegated to try to make contact with him. Mk has already recorded
fire---bummer I don’t get to yell "burn it down"--but
he needs get us his files and record the water section readings.)
|
|
A is worried about who is doing what with the video editing
for Fire. At first it sounds like he will only edit it together,
not create new footage, then the opposite; since no one is there the
whole time it is hard for N to determine who will do what and in relation
to what K wants. N and P talk about A doing the beginning burger,
then P and or A doing the violence N/Mk’s footage. P has already
minimized my files for tap-tiles—saving N time, A& P will
do the end and N will create words/numbers before the big boom. |
|
To do: P will get more blast footage. Do we need
any more violence footage N? P willing to edit together stage right
screen sequence. N buys online Quicktime Pro for Theatre Dell so that
we can use the full screen option installs with P in office. (MPEG
movies: N will export video without sound dummy, we need the sound
separately for Mk's sound score fore Water.) |
|
|